| |
| Client: |
Royal Mail |
| Site: |
Parcelforce Distribution Centre, Dorcan |
| Details: |
Movement joints in the roadway of this large Royal Mail site were damaged, causing
a fire hazard. In addition, the ramps leading to the buildings from the roadways
had eroded, causing a danger to the forklift trucks. Arrises of the roadway
joints were removed and replaced with hard-wearing, flexible polyurethane arrises,
movement joints reinstated. Forklift ramps reformed in a three-part pu mortar. |
|